SDG&E Pole Loading Analysis, 69 to 138 kV
Structural loading analysis and remediation design for steel and wood poles across 69 kV to 138 kV circuits, verifying capacity under California GO 95 wind and ice load cases.
A selection of transmission and distribution line work for utilities across North America, India and West Africa, each engineered in the Power Line Systems suite and sealed by a Professional Engineer.

Structural loading analysis and remediation design for steel and wood poles across 69 kV to 138 kV circuits, verifying capacity under California GO 95 wind and ice load cases.

Make-ready engineering for new fiber attachments on distribution poles, confirming clearances, structural capacity and tension limits before third-party attachment.

Clearance verification and remediation engineering on a 500 kV transmission corridor, modeling conductor sag and ground clearance to restore CSA compliance.

Structural design and analysis of twenty guyed lattice towers for a high-voltage transmission cascade, including foundation loads and stringing parameters.

Full transmission line design for a 63 kV connection between Gakpe and Ouidah, covering line routing, structure spotting and conductor selection for the West African grid.

Design package for a distribution crossing of the Fraser River near Lillooet (220C01), with long-span tension analysis and navigation clearance over water.

Structure and foundation engineering for the Farrel Creek distribution line, including MFAD foundation sizing for variable soil conditions.

Distribution feeder upgrade engineering for the Masset feeders in a coastal environment, accounting for elevated wind exposure and corrosion protection.